Advanced PP Training
746 Views
36 Votes
0 Comments
Start Date
5/10/2022 11:47 AM
Close Date
5/12/2022 11:55 PM
Voting Rule
Select Multiple (Least 3 And Maximum 3 Options)
1.The difference between a Discrete Manufacturing/Repetitive Manufacturing/Process Manufacturing process
Votes:
3
Vote
2.Classification/Batch determination
Votes:
0
Vote
3.KANBAN
Votes:
5
Vote
4.Variant Configuration
Votes:
4
Vote
5.Distribution Resources Planning
Votes:
1
Vote
6.Production Scheduling/Capacity Leveling/Capacity Planning
Votes:
2
Vote
7.Master data(Material,BOM,Work center, routing, production version LSMW/BDC)
Votes:
2
Vote
8.Sales and Operations Planning
Votes:
0
Vote
9.Demand Management
Votes:
2
Vote
10.Sub-contracting
Votes:
1
Vote
11.Serial Number Management
Votes:
0
Vote
12.Engineering Change Management
Votes:
2
Vote
13.Product Costing
Votes:
3
Vote
14.MRP / MPS
Votes:
4
Vote
15.Process manufacturing(configuring control recipe, PI sheets and Process Messages )
Votes:
3
Vote
16.Discrete Manufacturing(Order Configuration and enhancement
Votes:
0
Vote
17.Integration between PP and all other modules covering FI, CO, IM, SD, MM, PP, CS and PM
Votes:
4
Vote
Share
Link/QR Code
Copy
Scan QR code